Person: Marroyo Palomo, Luis
Loading...
Email Address
person.page.identifierURI
Birth Date
Research Projects
Organizational Units
Job Title
Last Name
Marroyo Palomo
First Name
Luis
person.page.departamento
Ingeniería Eléctrica, Electrónica y de Comunicación
person.page.instituteName
ISC. Institute of Smart Cities
ORCID
0000-0002-8344-8374
person.page.upna
495
Name
3 results
Search Results
Now showing 1 - 3 of 3
Publication Open Access Influence of control in cycling degradation when batteries perform PV ramp-rate control(IEEE, 2023) González Moreno, Alejandro; Marcos Álvarez, Javier; Parra Laita, Íñigo de la; Marroyo Palomo, Luis; Ingeniería Eléctrica, Electrónica y de Comunicación; Institute of Smart Cities - ISC; Ingeniaritza Elektrikoa, Elektronikoaren eta Telekomunikazio Ingeniaritzaren; Universidad Pública de Navarra / Nafarroako Unibertsitate PublikoaThis work studies the importance of the correct selection of control parameters in order to avoid unnecessary cycling in batteries when they perform PV smoothing. The classic ramp-rate control method (CRRC) is studied as smoothing technique and the key role of the state of charge (SOC) control is analyzed for a real 38.5 MW PV plant, particularly the influence of proportional gain (K). Depending on K, battery cycling degradation (CyD), power requirements, SOC limits and throughout energy performance were discussed. According to the results, the correct tuning could prolong battery lifespan by reducing cycling degradation up to 80% (depending on the fluctuation restrictions and K) and avoiding unnecessary energy losses, power requirements and undesirable SOC operation levels. Finally, a simple general rule is proposed to set K value when CRRC is used and its applicability is tested by simulating two additional PV plants with rated power of 1.1 and 75.6 MW.Publication Open Access The potential of forecasting in reducing the LCOE in PV plants under ramp-rate restrictions(Elsevier, 2019) Cirés Buey, Eulalia; Marcos Álvarez, Javier; Parra Laita, Íñigo de la; García Solano, Miguel; Marroyo Palomo, Luis; Ingeniería Eléctrica, Electrónica y de Comunicación; Institute of Smart Cities - ISC; Ingeniaritza Elektrikoa, Elektronikoaren eta Telekomunikazio IngeniaritzarenAn increasing number of grid codes are requiring the limitation of the PV output power fluctuation over a given time scale. Batteries represent the most obvious solution to smooth power fluctuations, with the corresponding negative impact on the PV energy cost. However, short-term forecasting is currently being proposed as a tool to reduce battery capacity requirements or even completely remove it. Although these solutions decrease or avoid the battery cost, it also entails some energy curtailment losses which obviously raise the final cost of PV energy. This energy losses, currently unknown, are independent of the forecasting accuracy and represent the minimal additional cost in the hypothetical case of a perfect prediction. Thus, this paper compares Levelized Cost of Energy (LCOE) of three ramp-rate control strategies in order to determine which would give the lowest cost: battery-based, ideal short-term forecasting, or a combination of both. Results show that curtailment losses would be small enough to make battery-less strategy an appropriate choice, so it is worthwhile improving short-term forecasting in view of the potential LCOE savings. Database is taken from high resolution measurements recorded for over a year at 8 PV plants ranging from 1 to 46 MWp.Publication Open Access Inverter-based PV ramp-rate limitation strategies: minimizing energy losses(IEEE, 2022) González Moreno, Alejandro; Marcos Álvarez, Javier; Parra Laita, Íñigo de la; Marroyo Palomo, Luis; Ingeniería Eléctrica, Electrónica y de Comunicación; Ingeniaritza Elektrikoa, Elektronikoaren eta Telekomunikazio Ingeniaritzaren; Universidad Pública de Navarra / Nafarroako Unibertsitate PublikoaThis work analyzes the reduction of power generation in strategies that regulate the PV ramp-rate by using inverter limitation. Although the operating principle implies some energy production losses, not all these losses are necessary. Three different strategies were simulated using experimental 5-second data collected throughout a year at a 38.6 MW PV plant, and their energy losses were obtained for different ramprate levels. An improvement in one of these strategies is proposed and evaluated. The main findings suggest that the proposed modification has the potential to drastically reduce annual production losses to insignificant levels. Regardless of the ramp-rate constrain, simulation results evidenced energy losses bellow 1%.