Grande Esteban, Ildefonso
Loading...
Email Address
person.page.identifierURI
Birth Date
Job Title
Last Name
Grande Esteban
First Name
Ildefonso
person.page.departamento
Gestión de Empresas
person.page.instituteName
ORCID
person.page.observainves
person.page.upna
Name
- Publications
- item.page.relationships.isAdvisorOfPublication
- item.page.relationships.isAdvisorTFEOfPublication
- item.page.relationships.isAuthorMDOfPublication
1 results
Search Results
Now showing 1 - 1 of 1
Publication Open Access Factors controlling sediment export in a small agricultural watershed in Navarre (Spain)(Elsevier, 2012) Giménez Díaz, Rafael; Casalí Sarasíbar, Javier; Grande Esteban, Ildefonso; Díez Beregaña, Javier; Campo-Bescós, Miguel; Álvarez-Mozos, Jesús; Goñi Garatea, Mikel; Proyectos e Ingeniería Rural; Landa Ingeniaritza eta Proiektuak; Gestión de Empresas; Enpresen Kudeaketa; Gobierno de Navarra / Nafarroako GobernuaIt is recognised that the hydrological and erosion processes in watersheds are very much conditioned by the (inter)action of a number of variables. This paper covers a 15-year period of studying those factors that have a major influence on the sediment yield and transport during individual hydrological events in a small Mediterranean agricultural watershed. Multivariate statistical techniques such as cluster analysis and principal component analysis were applied for the interpretation of datasets. In addition, the relationships between suspended sediment concentration and discharge (hysteretic loops) were also analysed. The hydrological response of the studied watershed is mainly controlled by the antecedent condition of the flow. Most of the runoff and sediment are generated during the wet season when vegetation cover is scant and saturation overland flow occurs promptly as a response to almost any rainfall events. In contrast, during the dry seasons even if high-intensity rainfalls normally occur, very scant runoffs are, however recorded, at the exit of the watershed. Most of the eroded sediment seems to come from riparian areas. The discharge registered at the watershed outlet up to 1 h prior to the flood is a very good surrogate for antecedent soil moisture.