Torre Campo, Joseba de laRubio Varas, María del MarSánchez Sánchez, Esther M.Sanz Lafuente, María Gloria2021-02-192021-02-1920201743-7938 (Electronic)10.1080/00076791.2020.1810239https://academica-e.unavarra.es/handle/2454/39204We analysed the process of construction and connection to the electrical grid of four Spanish nuclear power plants with different financial and technological foreign partners: those of Zorita (PWR by Westinghouse), Garoña (BWR by General Electric) and Vandellós I (GCR by EDF) (belonging to the first generation of atomic plants and producing electricity from 1969–72) and that of Trillo I (PWR by KWU, connected in 1988). These four examples allow us to observe how the learning curve of nuclear engineering and the acquisition of skills by Spanish companies evolved. Progressively the domestic industry achieved higher levels of participation, fostered by the Ministry of Industry and Energy. When the atomic plants under construction were paralysed by the nuclear moratorium of 1984, and several other projects were abandoned by the utilities along the way, Spain had developed an industrial sector around the fabrication of service components and engineering for nuclear power plants to compete internationally.26 p.application/pdfeng© 2020 The Author(s). This is an Open Access article distributed under the terms of the Creative Commons Attribution-NonCommercial-NoDerivatives License, which permits non-commercial re-use, distribution, and reproduction in any medium, provided the original work is properly cited, and is not altered, transformed, or built upon in any way.Technology transferMultinationalsTurnkey projectsNuclear engineering and technology transfer: the Spanish strategies to deal with US, French and German nuclear manufacturers, 1955–1985info:eu-repo/semantics/articleinfo:eu-repo/semantics/openAccessAcceso abierto / Sarbide irekia