Marcos Álvarez, JavierGarcía Solano, MiguelParra Laita, Íñigo de la2015-02-242015-02-2420152015-02-04https://academica-e.unavarra.es/handle/2454/16087Over the last few years, the considerable increase in the number of multi-MW PV plants has led transmission system operators (TSO) to express concern over potential PV power fluctuations caused by transient clouds. As a result, new grid codes are being issued in order to include new criteria which make it easier for the TSO to react appropriately to harmful short-term power fluctuations. It si precisely these new regulations the origin of this thesis, which is a pioneering study attempting to face with this situation. Herein, the main results in order to smooth out these fluctuations and comply with the regulations are presented.136 p.application/pdfengGrid integrationLarge-scale PV plantsEnergy storage systemsGrid integration of large-scale PV plantsTesis doctoral / Doktoretza tesiainfo:eu-repo/semantics/openAccessAcceso abierto / Sarbide irekia