Mejora continua (Hoshin) en una línea de producción de Hot Ends de tubos de escape

View/ Open
Date
2015Author
Advisor
Version
Acceso abierto / Sarbide irekia
Type
Trabajo Fin de Grado/Gradu Amaierako Lana
Impact
|
nodoi-noplumx
|
Abstract
The aim of this project is to carry out a theoretical-practical analysis of Lean
Manufacturing in a production line of the Hot End of an exhaust system. This exercise is called
Hoshin.
A Hoshin is a continuous improvement process in which all the people involved in the
production line take part: operators, line engineers, security department, quality department,
excellence system of the comp ...
[++]
The aim of this project is to carry out a theoretical-practical analysis of Lean
Manufacturing in a production line of the Hot End of an exhaust system. This exercise is called
Hoshin.
A Hoshin is a continuous improvement process in which all the people involved in the
production line take part: operators, line engineers, security department, quality department,
excellence system of the company or continuous improvement department et cetera.
The Hoshin exercise consists of four parts:
- Direct observation of the initial method that the operators are using to work in the
production line and detection of failures and different types of variability.
- Removal of the wastes by implementing improvements.
- Establishment of a new standardized work method.
- Tracking of the new method after implementing the different improvements.
What is intended to achieve with this exercise is a reduction of variability, an
improvement of security, quality, flows and ergonomics and a reorganization of the line to
make it more adaptable to customer’s demand, improving this way the line’s productivity. [--]
Subject
Continuous improvement,
Hoshin,
Lean manufacturing,
Elimination of wastes
Degree
Graduado o Graduada en Ingeniería en Tecnologías Industriales por la Universidad Pública de Navarra /
Industria Teknologietako Ingeniaritzan Graduatua Nafarroako Unibertsitate Publikoan