Diseño y estudio de valiablidad económica de dispositivo autónomo para instalación de cables submarinos para energías marinas renovables

View/ Open
Date
2016Author
Advisor
Version
Acceso abierto / Sarbide irekia
Type
Trabajo Fin de Máster/Master Amaierako Lana
Impact
|
nodoi-noplumx
|
Abstract
An innovative concept for submarine cables installation is developed and its application
to inter-array cables is evaluated economically. The state of the art in the installation of
subsea power cables in offshore wind farms is first reviewed. The innovative concept for
a remote-controlled submarine vehicle to install subsea cables is then presented.
The proposed system can significantly redu ...
[++]
An innovative concept for submarine cables installation is developed and its application
to inter-array cables is evaluated economically. The state of the art in the installation of
subsea power cables in offshore wind farms is first reviewed. The innovative concept for
a remote-controlled submarine vehicle to install subsea cables is then presented.
The proposed system can significantly reduce or eliminate altogether the need for
expensive specialist surface vessel. The dimensions and technical characteristics of the
vehicle are specified based on the design requirements for the installation of inter-array
cables in offshore wind farms.
Cost calculation based on publically available quotes show that if successfully
implemented, this innovative concept could easily lead to a 50% reduction in the cost of
the installation of inter-array cables in offshore wind farms, corresponding to a potential
reduction of the order of 5% in the cost of energy. [--]
Subject
Offshore,
Wind energy,
Submarine,
Cable,
Installation,
Remote,
Vehicle
Degree
Máster Universitario en Energías Renovables: Generación Eléctrica por la Universidad Pública de Navarra /
Energia Berriztagarrietako Unibertsitate Masterra: Sorkuntza Elektrikoa Nafarroako Unibertsitate Publikoan