Ramp-rate control in large PV plants: battery vs. short-term forecast
Fecha
2018Autor
Versión
Acceso abierto / Sarbide irekia
Tipo
Contribución a congreso / Biltzarrerako ekarpena
Identificador del proyecto
ES/1PE/DPI2016-80641-R ES/1PE/DPI2016-80642-R
Impacto
|
nodoi-noplumx
|
Resumen
The changeability in the power produced by utility-scale PV plants caused by shadows due to passing clouds can compromise grid stability. Traditionally, some kind of energy storage systems (ESS) is proposed as the solution to reduce power variations below the limits imposed by new grid codes regulations. However, recent short-term forecast sources open the door to control the variability without ...
[++]
The changeability in the power produced by utility-scale PV plants caused by shadows due to passing clouds can compromise grid stability. Traditionally, some kind of energy storage systems (ESS) is proposed as the solution to reduce power variations below the limits imposed by new grid codes regulations. However, recent short-term forecast sources open the door to control the variability without batteries, using only inverter limitation. This option entails some energy curtailment losses that has not been yet addressed. This paper quantifies these losses for the first time using a meaningful database of 5 s one year data for a 38.5 MW PV plant in a perfect forecast scenery. Finally, we compare the economic cost of installing a lithium-ion battery vs. the inverter limitation solution. The results obtained indicate that battery-less strategies must not be neglected for ramp-rate control, since they can be more cost-effective using perfect forecast for any ramp value. [--]
Materias
Renewable energy systems,
Photovoltaic,
Energy storage
Notas
Póster presentado a la 20th European Conference on Power Electronics and Applications, EPE ECCE Europe. Riga (Letonia), 2018.
Departamento
Universidad Pública de Navarra/Nafarroako Unibertsitate Publikoa. Institute of Smart Cities - ISC /
Universidad Pública de Navarra. Departamento de Ingeniería Eléctrica, Electrónica y de Comunicación /
Nafarroako Unibertsitate Publikoa. Ingeniaritza Elektrikoa, Elektronikoa eta Telekomunikazio Ingeniaritza Saila
Entidades Financiadoras
This work has been supported by the Spanish State Research Agency (AEI) and FEDER-UE under grants DPI2016-80641-R and DPI2016-80642-R.