Buscar
Mostrando ítems 1-1 de 1
Impact of generator speed filtering process on wind turbine structural loads
(2019)
Trabajo Fin de Grado/Gradu Amaierako Lana,
This Final Degree Project has been carried out in the company Siemens Gamesa Renewable Energy, in Sarriguren (Navarra, Spain). The aim of this project is to study the influence that filtering the generator speed has on ...