Mostrar el registro sencillo del ítem

dc.contributor.advisorMarcos Álvarez, Javieres_ES
dc.contributor.advisorGarcía Solano, Migueles_ES
dc.coverage.spatialeast=-1.5939724445343017; north=42.17409077904172; name=Arguedas, Navarra, España
dc.coverage.spatialeast=-1.6894332; north=42.1708012; name=Castejón, Navarra, España
dc.coverage.spatialeast=-1.7648352; north=42.2412062; name=Milagro, Navarra, España
dc.coverage.spatialeast=-1.5733411; north=42.3197772; name=Rada, Navarra, España
dc.coverage.spatialeast=-2.0824549; north=42.4769221; name=Sesma, Navarra, España
dc.coverage.spatialeast=-1.8062402; north=42.0800902; name=Cintruénigo, Navarra, España
dc.coverage.spatialeast=-1.7648352; north=42.2412062; name=Milagro, Navarra, España
dc.creatorParra Laita, Íñigo de laes_ES
dc.date.accessioned2015-02-24T09:39:29Z
dc.date.available2015-02-24T09:39:29Z
dc.date.issued2015
dc.date.submitted2015-02-04
dc.identifier.urihttps://hdl.handle.net/2454/16087
dc.description.abstractOver the last few years, the considerable increase in the number of multi-MW PV plants has led transmission system operators (TSO) to express concern over potential PV power fluctuations caused by transient clouds. As a result, new grid codes are being issued in order to include new criteria which make it easier for the TSO to react appropriately to harmful short-term power fluctuations. It si precisely these new regulations the origin of this thesis, which is a pioneering study attempting to face with this situation. Herein, the main results in order to smooth out these fluctuations and comply with the regulations are presented.en
dc.description.sponsorshipThis thesis has been partially financed by the Seventh Framework Programme of the European Commission with the project PVCROPS (Photovoltaic Cost R€duction, Reliability, Operational Performance, Prediction and Simulation – Grant Agreement no: 308468) and by the Spanish Ministry of Economy and Competitiveness under Grant DPI2013-42853-R.en
dc.format.extent136 p.es_ES
dc.format.mimetypeapplication/pdfen
dc.language.isoengen
dc.relation.urihttps://biblioteca.unavarra.es/abnetopac/abnetcl.cgi?TITN=433022
dc.subjectGrid integrationen
dc.subjectLarge-scale PV plantsen
dc.subjectEnergy storage systemsen
dc.titleGrid integration of large-scale PV plantsen
dc.typeTesis doctoral / Doktoretza tesiaes
dc.typeinfo:eu-repo/semantics/doctoralThesisen
dc.contributor.departmentIngeniería Eléctrica y Electrónicaes_ES
dc.contributor.departmentIngeniaritza Elektrikoa eta Elektronikoaeu
dc.rights.accessRightsinfo:eu-repo/semantics/openAccessen
dc.rights.accessRightsAcceso abierto / Sarbide irekiaes
dc.relation.projectIDinfo:eu-repo/grantAgreement/European Commission/FP7/308468en
dc.relation.projectIDinfo:eu-repo/grantAgreement/MINECO//DPI2013-42853-R/ES/en


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem


El Repositorio ha recibido la ayuda de la Fundación Española para la Ciencia y la Tecnología para la realización de actividades en el ámbito del fomento de la investigación científica de excelencia, en la Línea 2. Repositorios institucionales (convocatoria 2020-2021).
Logo MinisterioLogo Fecyt