Publication:
Learning by doing: the first Spanish nuclear power plant

Date

2018

Director

Publisher

Cambridge University Press
Acceso abierto / Sarbide irekia
Artículo / Artikulua
Versión publicada / Argitaratu den bertsioa

Project identifier

MINECO//HAR2014-53825-R/ES/recolecta
Métricas Alternativas

Abstract

In the nuclear sector, turnkey projects can be considered an investment in obtaining information through “learning by doing” to capture rents from the next generation of reactors. As the first U.S. turnkey export project, the first Spanish nuclear power plant served that purpose and paved the way to the subsequent growth of the nuclear sector, for both Spanish and U.S. firms. Making use of archival material, we analyse the networks created by the government, experts, and business leaders, which sought to obtain, accumulate, and learn from the scarce and conflicting information about atomic technology that was available at the time. We also discern how firms on both sides of the Atlantic acquired and perfected the specific capabilities required to build a commercial nuclear reactor.

Description

This article has been published in a revised form in Business History Review, 92 (Spring 2018): 29–55, https://doi.org/10.1017/S0007680518000053. This version is free to view and download for private research and study only. Not for re-distribution, re-sale or use in derivative works. © The President and Fellows of Harvard College 2018.

Keywords

Energy, Micro-business history, Choice of technology, International linkages to development

Department

Economía / Ekonomia

Faculty/School

Degree

Doctorate program

item.page.cita

item.page.rights

© The President and Fellows of Harvard College 2018

Los documentos de Academica-e están protegidos por derechos de autor con todos los derechos reservados, a no ser que se indique lo contrario.