Reutilización de cimentaciones y repotenciación del Parque Eólico del Perdón

dc.contributor.advisorTFEGimena Ramos, Faustinoes_ES
dc.contributor.advisorTFEGonzaga Vélez, Pedroes_ES
dc.contributor.affiliationEscuela Técnica Superior de Ingeniería Industrial, Informática y de Telecomunicaciónes_ES
dc.contributor.affiliationIndustria, Informatika eta Telekomunikazio Ingeniaritzako Goi Mailako Eskola Teknikoaeu
dc.contributor.authorRodríguez-Amenábar Vieyra, Fermín
dc.date.accessioned2023-09-21T08:36:36Z
dc.date.issued2023
dc.date.updated2023-09-19T10:34:38Z
dc.description.abstractEspaña fue uno los primeros países en apostar por la energía eólica, lo que lo sitúa ahora como uno de los máximos referentes en este rubro. No obstante, esto significa que los primeros parques eólicos del país ibérico están en la recta final de su vida útil, resultando necesario repotenciarlos. Ante esto surge la duda. ¿Qué se va a hacer con los materiales sustituidos? Este TFG apunta justamente en dicha dirección, fijando su objetivo en la reutilización de las cimentaciones a la hora de repotenciar un parque, centrándose en el que está ubicado en la Sierra del Perdón, que, con 25 años, es el parque eólico más antiguo en funcionamiento del país. Para esto se investigan los tipos de cimientos empleados, la geotecnia de la zona, las cargas que se producen con diferentes modelos de aerogenerador, y con estos, se hacen los diseños de las zapatas necesarias para cada modelo estudiado. Una vez se tienen los diseños, se plantean tres opciones de construcción diferentes, en dos de ellas se reutilizan las zapatas actuales, y en la otra no. Estimando los presupuestos, y contemplando el funcionamiento que tendrá la propia zapata, así como la cantidad de aerogeneradores que pasará a tener el parque en función del modelo de turbina, se llega a la propuesta final. Se decide repotenciar la Sierra del Perdón, sustituyendo sus 40 turbinas de 0,6 MW cada una, por 7 de 3 MW. Las zapatas de estas reutilizarán las de los modelos antiguos, tal que la nueva construcción rodeará de todo el perímetro de la antigua, haciendo uso también de las jaulas de pernos para asegurar que trabajen solidariamente.es_ES
dc.description.abstractSpain was one of the first countries to bet on wind energy, which now places it as one of the maximum references in this area. However, this means that the first wind farms in the Iberian country are in the final stretch of their useful life, and it is necessary to repower them. Faced with this, doubt arises. What will be done with the replaced materials? This TFG points precisely in this direction, setting its objective in the reuse of foundations when repowering a park, focusing on the one located in the Sierra del Perdón, which, with 25 years, is the oldest wind farm in operation in the country. For this, the types of foundations used, the geotechnics of the area, the loads that are produced with different models of wind turbine are investigated, and with these, the designs of the necessary footings for each model studied are made. Once you have the designs, three different construction options are proposed, in two of them the current shoes are reused, and in the other not. Estimating the budgets, and contemplating the operation that the foundation itself will have, as well as the number of wind turbines that the park will have depending on the turbine model, the final proposal is reached. It was decided to repower the Sierra del Perdón, replacing its 40 turbines of 0.6 MW each, with 7 of 3 MW. The foundations of these will reuse those of the old models, such that the new construction will surround the entire perimeter of the old one, also making use of the bolt cages to ensure that they work together.en
dc.description.degreeGraduado o Graduada en Ingeniería Mecánica por la Universidad Pública de Navarraes_ES
dc.description.degreeIngeniaritza Mekanikoko Graduatua Nafarroako Unibertsitate Publikoaneu
dc.embargo.lift2028-10-01
dc.embargo.terms2028-10-01
dc.format.mimetypeapplication/pdfen
dc.identifier.urihttps://academica-e.unavarra.es/handle/2454/46396
dc.language.isospaen
dc.rights.accessRightsAcceso embargado 5 años / 5 urteko bahituraes
dc.rights.accessRightsinfo:eu-repo/semantics/embargoedAccessen
dc.subjectEnergía eólicaes_ES
dc.subjectCimientoes_ES
dc.subjectRepotenciaciónes_ES
dc.subjectAcción gravitacionales_ES
dc.subjectAcción aerodinámicaes_ES
dc.subjectUnión mecánicaes_ES
dc.subjectUnión perimetrales_ES
dc.subjectWind poweren
dc.subjectFoundationen
dc.subjectRepoweren
dc.subjectGravitational forceen
dc.subjectAerodinamic forcéen
dc.subjectMechanical joinen
dc.subjectPerimetral joinen
dc.titleReutilización de cimentaciones y repotenciación del Parque Eólico del Perdónes_ES
dc.typeTrabajo Fin de Grado/Gradu Amaierako Lanaes
dc.typeinfo:eu-repo/semantics/bachelorThesisen
dspace.entity.typePublication

Files

Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
TFG_Rodriguez Amenabar Vieyra.pdf
Size:
13.25 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.78 KB
Format:
Item-specific license agreed to upon submission
Description: